Please contact the contributing institution for more information regarding the copyright status of this object.
Description
No. 5881 On recto: Canal Statistics; Length 40 miles; Channel width on top 500 to 1000ft; channel width on bottom, 300-650 ft; Time of passage Through Canal 10 hours Through Locks 3 hours. Gatun Dam Length of crest 8000ft; Extreme width 2600 ft. Locks; At Gatun 3 double sets, At Pedro Miguel 1 double set, At Miraflores 2 double sets; Average lift 32 ft.; Length 1000; Width 110 ft; Culebra Cut Length 9 miles; Total number of men employed 40,000;Estimated total cost;375,000,000;Area of Canal Zone 448 Sq. Miles
If you're wondering about permissions and what you can do with this item, a good starting point is the "rights information" on this page. See our terms of use for more tips.
Share your story
Has Calisphere helped you advance your research, complete a project, or find something meaningful? We'd love to hear about it; please send us a message.