Handwritten listing of months and their numbered days (February
17-June 14), written in columns on ruled paper and accompanied by
two over-lays, one headed "Units," of things to do on specific dates.
Also included are two additional listings (without overlays): one (May
4-June 26) with entries for the final script and interlock deadlines; and
the other, (August 17-September 18) with a notation about the answer
print and the status of inter-positive reels. Scanned from original text or image using a Canon Expression 10000XL scanner. Optimized in Adobe Acrobat 9 Pro and saved in .pdf format.