Researchers may make free and open use of the Meriam Library’s digitized public domain materials without obtaining permission. However, some materials in our online collections may be protected by U.S. copyright law (Title 17, U.S.C.). Use or reproduction of materials protected by copyright beyond that allowed by fair use (Title 17, U.S.C. § 107) requires permission from the copyright owners. The use or reproduction of some materials may also be restricted by terms of the Meriam Library’s gift or purchase agreements. Responsibility for determining rights status and permissibility of any use or reproduction rests exclusively with the researcher. The Library asks to be credited as the materials source whenever possible. To request permission for reuse of this image select this link to our web request form: https://library.csuchico.edu/special-collections/license
Description
Photograph shows CVP Canal in Contra Costa County--Gracefully curving into the Clayton Valley near Concord, another length of the Contra Costa Canal has been completed by the United States Bureau of Reclamation. This section is 20 feet wide at the top and 5 1/2 feet deep. Twenty-nine miles of canal back of this point are in service delivering Central Valley Project water to industries, homes, and farms. Construction is proceeding on a new section beyond Walnut Creek.
If you're wondering about permissions and what you can do with this item, a good starting point is the "rights information" on this page. See our terms of use for more tips.
Share your story
Has Calisphere helped you advance your research, complete a project, or find something meaningful? We'd love to hear about it; please send us a message.