FT. MOORE HILL JOB -- Excavators of Ft. Moore Hill have reached the level at which bridge joining Hill and Castelar Sts. will be constructed. The level is 40 feet above Sunset Blvd. and extends back some 100 yards through decomposed granite. Bridge will have an 80-foot grade extending from just south of Sunset Blvd. to Ord and Castelar Sts. Castelar probably will become Hill St., which link will run into the Arroyo Seco Parkway.
Type
image
Format
b&w negative
Identifier
uclalat_1429_b69_58469 ark:/21198/zz0002nj4g
Language
No linguistic content
Subject
Express highways--California--Los Angeles County--Design and construction Excavation--California--Los Angeles County Environment Los Angeles City Hall (Los Angeles, Calif.)
If you're wondering about permissions and what you can do with this item, a good starting point is the "rights information" on this page. See our terms of use for more tips.
Share your story
Has Calisphere helped you advance your research, complete a project, or find something meaningful? We'd love to hear about it; please send us a message.