UC Riverside, Library, Water Resources Collections and Archives > Clearinghouse for Dam Removal Information (CDRI) > Preliminary Fish Passage Monitoring Plan for the Sandy River following the Removal of Marmot Dam

Text / Preliminary Fish Passage Monitoring Plan for the Sandy River following the Removal ...

Have a question about this item?

Item Information.

Title
Preliminary Fish Passage Monitoring Plan for the Sandy River following the Removal of Marmot Dam
Creator
Stillwater Sciences for the Portland General Company
Date Created and/or Issued
3/19/03
Publication Information
Federal Energy Regulatory Commission (FERC)
Contributing Institution
UC Riverside, Library, Water Resources Collections and Archives
Collection
Clearinghouse for Dam Removal Information (CDRI)
Rights Information
Copyrighted
Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
Description
Scope/Content: Abstract: FERC issued docket number p-477:This monitoring plan proposes to use channel complexity as an indicator of potential fish barriers following the removal of Marmot Dam. Channel complexity at four monitoring sites will be measured using the standard deviation of chaunel bed elevation, which will be surveyed annually for at least three years prior to dam removal, and continue annually after the dam removal unti[ the risks of potential passage barrier formation becomes sufficiently small. We selected one site in the Reservoir Reach, two sites in Reach 1, and one site at the top of Reach 3. In the Reservoir Reach and Reach l, the monitoring duration would be one year pins two consecutive yeats with (1) no barriers to fish passage, and (2) either improved channel complexity or channel complexity within the range of values prior to dam removal (i.e., monitoring would be conducted for at least three years in these reaches). Reach 3 would be monitored for the duration of monitoring in Reach I plus two consecutive years with (I) no barriers to fish passage, and (2) either improved channel complexity or channel complexity within the range of valuas prior to dam removal (i.e., monitoring would be conducted for at least five years in this reach). Channel bed surveys must be accompanied by reconnaissance trips to assess actual passase conditions in the Sandy River.
Type
text
Form/Genre
digital copy
Identifier
ark:/86086/n29g5mg6
289
Subject
Fisheries and fish passage
Pre- and post-project monitoring
Dams
Dam retirement
Place
Little Sandy River, OR
Sandy River, OR
Little Sandy Diversion Dam
Marmot Dam
United States
Relation
http://elibrary.ferc.gov/IDMWS/search/intermediate.asp?link_desc=yes&slcfilelist=9803640:0

Explore related content on Calisphere: