UC Riverside, Library, Water Resources Collections and Archives > Clearinghouse for Dam Removal Information (CDRI) > Harpeth river stormwater analysis of pervious parking lott

Text / Harpeth river stormwater analysis of pervious parking lott

Have a question about this item?

Item Information.

Title
Harpeth river stormwater analysis of pervious parking lott
Creator
Beaver Creek Hydrology
Date Created and/or Issued
12/9/11
Contributing Institution
UC Riverside, Library, Water Resources Collections and Archives
Collection
Clearinghouse for Dam Removal Information (CDRI)
Rights Information
Copyrighted
Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
Description
Scope/Content: Abstract: This letter serves as a report on the stormwater treatment capacity of the pervious pavement parking lot that will be constructed as part of the Harpeth River Restoration Project. This report will include all of the site parameters, design assumptions and results of the analysis. The site was designed using steps 1 through 4 as recommended in the Post Construction Water Quality Policies and Procedure manual. The steps are as follows: 1. Impact reducing site design 2. Integrated Stormwater Sizing 3. Stormwater Credits 4. Selection of Structural Stormwater Controls
Scope/Content: Dam type: concrete
Scope/Content: Date constructed: 1963. Date removed: 2012.
Type
text
Identifier
ark:/86086/n2gf0t5z
1427
Subject
Pre- and post-project monitoring
Dams
Dam retirement
Place
Harpeth River, TN
Harpeth River Dam