Text / Final Curtis Pond Dam Removal Feasibility Study

Have a question about this item?

Item Information.

Title
Final Curtis Pond Dam Removal Feasibility Study
Creator
Ipswich RIver Watershed Association
Kleinfelder/SEA Consultants
Pare Corporation
Date Created and/or Issued
2010
Contributing Institution
UC Riverside, Library, Water Resources Collections and Archives
Collection
Clearinghouse for Dam Removal Information (CDRI)
Rights Information
Copyrighted
Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
Description
Scope/Content: Abstract: Final feasibility study for the removal of the Curtis Pond Dam in Middleton, MA. This was the first dam on Boston Brook upstream of its confluence with the Ipswich River. As of 2012 there are two dams (both on the Ipswich) between this site and the ocean. Both downstream dams have fishways.
Scope/Content: Dam type: concrete
Scope/Content: Date removed: 2012.
Type
text
Identifier
ark:/86086/n2gq6xdc
1386
Subject
Alternative analysis (e.g., feasibility studies, EIRs)
Dams
Dam retirement
Place
Boston Brook, MA
Curtis Pond Dam