We recommend you include the following information in your citation. Look below the item for additional data you may want to include.
Contact Owning Institution
All fields are required.
Download Item
Please use this item responsibly. Check the rights information for this item to see if it has copyright restrictions. Note that even if the item is protected by copyright, you may be able to use it for educational, research, or other purposes. To learn more, read Calisphere's terms of use.
Do you need a bigger file? To obtain an alternate file type or higher resolution copy, please
contact the owning institution.
Copyrighted Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
Description
Scope/Content: Abstract: The removal of the 3.66-m-high Munroe Falls Dam from the Cuyahoga River in Summit County, Ohio, between August and October 2005, follows an accelerating trend to remove dams for the purpose of river restoration. The response of the middle reach of the Cuyahoga River to this dam removal resulted in sedimentologic, morphologic and hydrologic changes. These changes were monitored by measuring transects, discharge and velocity, and collecting bed sediment both pre-removal and post-removal. The overall change to the mean grain size of the channel-floor deposits was characterized by coarsening upstream, and fining downstream of the former dam. The greatest degree of coarsening occurred within 1,000 m upstream of the former dam site. Following dam removal, changes in channel morphology were characterized by approximately 1 m of bed aggradation downstream of the dam site. Upstream, the channel quickly incised to the pre-1817 (pre-dam) substrate within a month of dam removal. Once the pre- 1817 substrate was reached, downcutting stopped, and channel-widening became the dominant morphologic response. Prior to dam removal, flow velocity within the impoundment limited sediment transport to suspended load in all but the largest flows of the year. Following removal, reduced cross-sectional area and greater slope, increased flow velocity by 4 to 15 times. Now the river erodes and transports sandsized sediment as bedload even during the low-flow periods. Bedload discharge measurements indicate the largest sediment source is the former impoundment sediment. Scope/Content: Dam type: concrete Scope/Content: Height: 3.66 meters. Scope/Content: Date constructed: 1817. Date removed: 2005.
If you're wondering about permissions and what you can do with this item, a good starting point is the "rights information" on this page. See our terms of use for more tips.
Share your story
Has Calisphere helped you advance your research, complete a project, or find something meaningful? We'd love to hear about it; please send us a message.