Title
San Clemente Dam Seismic Safety Project- Draft Supplement to the EIR, No. 2 Old Carmel River Dam Removal
Creator
URS Corporation
Contributing Institution
UC Riverside, Library, Water Resources Collections and Archives
Collection
Clearinghouse for Dam Removal Information (CDRI)
Rights Information
Copyrighted
Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
Description
Scope/Content: Abstract: California American Water Company proposes to remove San Clemente Dam and reroute the Carmel River, as described in Alternative 3 of the 2008 Final Environmental Impact Report/Environmental Impact Statement (EIR/EIS). This project was revised and potential new impacts and mitigation measures were described in the April 2012 Supplement to the EIR (April 2012 SEIR). This Draft Supplement No. 2 to the Final EIR (DSEIR No. 2) has been prepared to describe a further refinement to the project, the removal of OCRD, analyze potential impacts associated with the change to the project, and propose mitigation for those impacts. The project refinement described in DSEIR No.2 would consist of removing OCRD entirely and restoring the Carmel River in the vicinity of the dam to a natural state. The 2008 Final EIR/EIS and the April 2012 SEIR analyzed leaving OCRD in place, but cutting a 19 foot wide by 9 foot deep notch in the dam. As with the Proposed Project described in the 2008 Final EIR/EIS and the revised Project described in the April 2012 SEIR, the project with the refinement described in this DSEIR No. 2 will meet the stated purpose and objectives by improving fish passage in the Carmel River.
Scope/Content: Dam type: arch
Scope/Content: Dam type: concrete
Scope/Content: Reservoir size: 1425 acre-feet. Height: 106 feet.
Scope/Content: Date constructed: 1921.
Type
text
Identifier
ark:/86086/n2jh3kvg
1373
Language
English
eng
Subject
Alternative analysis (e.g., feasibility studies, EIRs)
Dams
Dam retirement
Place
Carmel River, CA
San Clemente Dam