UC Riverside, Library, Water Resources Collections and Archives > Clearinghouse for Dam Removal Information (CDRI) > Hydrology, Hydraulics, and Sediment Studies for the Matilija Dam Ecosystem Restoration Project, Ventura, CA -- DRAFT Report

Text / Hydrology, Hydraulics, and Sediment Studies for the Matilija Dam Ecosystem Restoration Project, ...

Have a question about this item?

Item Information.

Title
Hydrology, Hydraulics, and Sediment Studies for the Matilija Dam Ecosystem Restoration Project, Ventura, CA -- DRAFT Report
Creator
U.S. Department of the Interior Bureau of Reclamation Technical Service Center
Date Created and/or Issued
11/1/06
Contributing Institution
UC Riverside, Library, Water Resources Collections and Archives
Collection
Clearinghouse for Dam Removal Information (CDRI)
Rights Information
Copyrighted
Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
Description
Scope/Content: Abstract: The Bureau of Reclamation (Reclamation) is providing technical assistance in the Matilija Dam Ecosystem Restoration Project -- a cost-shared project between the Corps of Engineers (Corps) and Ventura County Flood Control District (District). The Corps requested Reclamation to perform the hydrology, hydraulics, and sedimentation analyses. Work elements associated with this task are consistent with items delineated in the Corps Project Management Plan (PMP). To ensure successful achievement of certain items described in the PMP, Reclamation requested assistance from U.S. Geological Surveys (USGS). Included in this report are results from the hydrology, hydraulic and sediment studies for the Matilija Dam Ecosystem Restoration Project.
Scope/Content: Dam type: arch
Scope/Content: Dam type: concrete
Scope/Content: Reservoir size: <500 acre-ft. Height: 198 ft. Length: 620 ft.
Scope/Content: Date constructed: 1947.
Type
text
Identifier
ark:/86086/n2nz879g
693
Subject
Engineering
Dams
Dam retirement
Place
Ventura River, CA
Matilija Dam
United States

Explore related content on Calisphere: