Skip to main content

Text / PacifiCorp's Operations and Compliance Plan for the Bear River Hydroelectric Project

Have a question about this item?

Item information.

Title
PacifiCorp's Operations and Compliance Plan for the Bear River Hydroelectric Project
Creator
Pacificorp
Date Created and/or Issued
12/27/04
Publication Information
Federal Energy Regulatory Commission (FERC)
Contributing Institution
UC Riverside, Library, Water Resources Collections and Archives
Collection
Clearinghouse for Dam Removal Information (CDRI)
Rights Information
Copyrighted
Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
Description
Scope/Content: Abstract: FERC issued docket number p-20:PacifiCorp received a new license for the Bear River Hydroelectric Project (Project) on December 22, 2003. The Project inclres three hydroelectric developments located on the Bear River in Caribou and Franklin Counties, Idaho. The 30-year license allows for the continued operation and maintenance of the Soda Development, the Grace and Cove Deveopments, and the Oneida Development. This Operations and Compliance PLan (Plan) has been prepared, as required by Article 415 of the license, to decribe compliance with minimum flow requirements and ramping rates as directed in Articles 408 and 412, respectively. The Plan includes the following information for each development of the Bear River Project: the proposed methodology and locations for monitoring minimum flows and ramping rates; specific measures to ensure that the monitoring system would operate under all conditions, including loss of external electric power to the project; the design of the monitoring devices, includings any pertinent hydraulic calculations, technical speciifications or proposed instrumentation, erosion and sediment control measures, as appropriate and design drawings of the system; a description of the relative extent of manned versus automatic operation of the monitoring equivalent; a decription of the methods and schedule for installing, calibrating, operating and maintaning the monitoring equipment; proposed data collection and storage protocols; provisions for reporting the recorded data to the Commission and the consulted agencies; provisions for reporting incidents in which minimum flows or ramping rates deviate from license requirements, and a schedule for implementation.
Type
text
Form/Genre
digital copy
Identifier
ark:/86086/n2pv6k1j
269
Subject
Engineering
Dams
Dam retirement
Place
Bear River, ID
Cove Dam
Grace Dam
Oneida Dam
Soda Dam
United States
Relation
http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_desc=yes&slcfilelist=10359156:0

About the collections in Calisphere

Learn more about the collections in Calisphere. View our statement on digital primary resources.

Copyright, permissions, and use

If you're wondering about permissions and what you can do with this item, a good starting point is the "rights information" on this page. See our terms of use for more tips.

Share your story

Has Calisphere helped you advance your research, complete a project, or find something meaningful? We'd love to hear about it; please send us a message.

Explore related content on Calisphere: