UC Riverside, Library, Water Resources Collections and Archives > Clearinghouse for Dam Removal Information (CDRI) > Decommissioning and Site Restoration of Non-Federal Hydroelectric Projects

Text / Decommissioning and Site Restoration of Non-Federal Hydroelectric Projects

Have a question about this item?

Item Information.

Title
Decommissioning and Site Restoration of Non-Federal Hydroelectric Projects
Creator
John A Schnagl
Federal Enargy Regulatory Commission
Date Created and/or Issued
2000
Contributing Institution
UC Riverside, Library, Water Resources Collections and Archives
Collection
Clearinghouse for Dam Removal Information (CDRI)
Rights Information
Copyrighted
Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
Description
Scope/Content: Abstract: This presentation is an overview of the role that FERC plays in Dam removal. It uses three examples: Edwards Dam, Mussers Dam, and Fort Edwards Dam and steps through the problems encountered at each one. The presentation also briefly summarizes the lessons learned at all of these sites and ideas for future projects.
Scope/Content: Dam type: concrete
Scope/Content: Dam type: other
Type
text
Form/Genre
digital copy
Identifier
ark:/86086/n2rv0nbr
25
Language
English
eng
Subject
Economics
Legal and policy
Safety and liability
Sediment and channel dynamics
Dams
Dam retirement
Place
Edwards Dam
Mussers Dam
USA

Explore related content on Calisphere: