Text / Wapping Road Dam Feasibility Study

Have a question about this item?

Item Information.

Title
Wapping Road Dam Feasibility Study
Creator
Milone & MacBroom, Inc.
Date Created and/or Issued
3/6/09
Publication Information
Jones River Watershed Association
Contributing Institution
UC Riverside, Library, Water Resources Collections and Archives
Collection
Clearinghouse for Dam Removal Information (CDRI)
Rights Information
Copyrighted
Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
Description
Scope/Content: Abstract: Feasibility study for the proposed removal of the Wapping Road Dam on the Jones River in Kingston, Massachusetts. Dam removal would increase diadromous fish passage beyond this first downstream barrier. The document analyzes various data sources and assesses removal feasibility.
Scope/Content: Dam type: concrete
Scope/Content: Reservoir size: 9.5 acre-ft. Height: 9 ft. Length: 38 ft.
Scope/Content: Date constructed: 1924.
Type
text
Identifier
ark:/86086/n2wm1cwt
995
Language
English
eng
Subject
Alternative analysis
Ecology and river restoration
Fisheries and fish passage
Dams
Dam retirement
Place
Jones River, MA
Wapping Road Dam

Explore related content on Calisphere: