Text / Gold Ray Dam Project Fish Passage & Salvage Plan for Dam Removal

Have a question about this item?

Item Information.

Title
Gold Ray Dam Project Fish Passage & Salvage Plan for Dam Removal
Creator
HDR, Inc.
River Design Group
Slayden Construction Group
Date Created and/or Issued
10-Feb
Contributing Institution
UC Riverside, Library, Water Resources Collections and Archives
Collection
Clearinghouse for Dam Removal Information (CDRI)
Rights Information
Copyrighted
Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
Description
Scope/Content: Abstract: The design-build team of Slayden Construction Group, Inc. (SCG), River Design Group, Inc. (RDG) and HDR, Inc. was retained by Jackson County Roads and Parks to perform environmental studies, dam removal design and permitting, and deconstruction of the Gold Ray Dam. This study presents a detailed fish passage and salvage plan has been developed in consultation with the Oregon Department of Fish and Wildlife (ODFW) and National Marine Fisheries Service (NMFS).
Scope/Content: Dam type: concrete
Scope/Content: Height: 38 feet. Length: 360 feet.
Scope/Content: Date constructed: 1941. Date removed: 2010.
Type
text
Identifier
ark:/86086/n2wm1d2g
1054
Subject
Fisheries and fish passage
Dams
Dam retirement
Place
Rogue River, OR
Gold Ray Dam