We recommend you include the following information in your citation. Look below the item for additional data you may want to include.
Contact Owning Institution
All fields are required.
Download Item
Please use this item responsibly. Check the rights information for this item to see if it has copyright restrictions. Note that even if the item is protected by copyright, you may be able to use it for educational, research, or other purposes. To learn more, read Calisphere's terms of use.
Do you need a bigger file? To obtain an alternate file type or higher resolution copy, please
contact the owning institution.
Copyrighted Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
Description
Scope/Content: Abstract: The Elk Creek Project was authorized as one of three multiple purpose projects designed to operate as a system to reduce flooding in the Rogue River Basin, Oregon and to accomplish additional purposes such as irrigation, recreation, fish and wildlife enhancement, and water quality control. The other two dams are complete and operational. Lost Creek Dam was completed in 1976, followed by Applegate Dam in 1980. Scope/Content: Date constructed: 1986.
If you're wondering about permissions and what you can do with this item, a good starting point is the "rights information" on this page. See our terms of use for more tips.
Share your story
Has Calisphere helped you advance your research, complete a project, or find something meaningful? We'd love to hear about it; please send us a message.