Please contact DWP for assistance. This is not a Library Collection, it is hosted for DWP. ; Researchers may view the collection in person at DWP by appointment only, Monday through Friday, 8am – 3pm. For information and appointments, contact Angela Tatum at (213) 367-8906. ; Photos that are published should properly credit the owner of the photo as “Historical Photo Collection of the Department of Water and Power, City of Los Angeles”.
Description
Shows tunnel car known as The Jeep hauling load of material. They blasted and drilled 142 tunnels totaling more than 43 miles in length. They built 34 miles of open unlined channel, 39 miles of concrete lined channel, and 98 miles of covered conduit which was cast in place. Some of the conduit was large enough to drive a car through
If you're wondering about permissions and what you can do with this item, a good starting point is the "rights information" on this page. See our terms of use for more tips.
Share your story
Has Calisphere helped you advance your research, complete a project, or find something meaningful? We'd love to hear about it; please send us a message.