Skip to main content

Text / PacifiCorp Submits its 2002 Dam Monument Survey Results

Have a question about this item?

Item information.

Title
PacifiCorp Submits its 2002 Dam Monument Survey Results
Creator
Pacificorp
Date Created and/or Issued
12/6/02
Publication Information
Federal Energy Regulatory Commission (FERC)
Contributing Institution
UC Riverside, Library, Water Resources Collections and Archives
Collection
Clearinghouse for Dam Removal Information (CDRI)
Rights Information
Copyrighted
Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.
Description
Scope/Content: Abstract: FERC issued docket number p-20, p-2381, p-2401, p-472, p-2420, p-6509. The work consisted of surveying existing dam control monuments at the Ashton Darn, Cutler Dam, Grace Dam, Oneida concrete Dam and earthen embankment Dam, Soda Dam and Viva Naughton Dam. At least two monuments at each dam site have been assigned as fixed and arc shown as "BENCH MARKS". The field measurements have been computed and compared to a base measurement made in 1988. The values are reported in appropriate 1927 State Plane Coordinates with elevations based on NGVD '29 datum. The 1988 report showed a grid bearing between the fixed monuments and the values for the monument reported as "Bench Mark" was used as a basis for the comparison. This report includes a copy of a spreadsheet computation that shows 1988 base values, and the other measured values calculated, and a comparison noting any bearing changes, distances from the Bench Mark Monument, differences noting left or fight and differences in elevations. Please note that the left or right data shown on the spreadsheet is in reference to the base year difference and not the benchmark base line. A graphic representation for each monument, except for Bench Marks, has also been prepared. It shows the monument's position on the dam with an inset of plotted coordinates at actual scale and a bar graph noting vertical movement.
Type
text
Form/Genre
digital copy
Identifier
ark:/86086/n2st7rzp
273
Language
English
eng
Subject
Pre- and post-project monitoring
Dams
Dam retirement
Place
Bear River, ID
Bear River, UT
Hams Fork River, ID
Hams Fork River, UT
Snake River, ID
Snake River, UT
Ashton Dam
Cutler Dam
Grace Dam
Oneida Dam
Soda Dam
Viva Naughton Dam
United States
Relation
http://elibrary.ferc.gov/idmws/search/intermediate.asp?link_desc=yes&slcfilelist=10612099:0

About the collections in Calisphere

Learn more about the collections in Calisphere. View our statement on digital primary resources.

Copyright, permissions, and use

If you're wondering about permissions and what you can do with this item, a good starting point is the "rights information" on this page. See our terms of use for more tips.

Share your story

Has Calisphere helped you advance your research, complete a project, or find something meaningful? We'd love to hear about it; please send us a message.

Explore related content on Calisphere: